Refinery wharf of Talara
01.01.2015
Construction of the dry cargo dock and remodelling of the current liquid loading dock. The works include the construction of the control building, electrical and equipment compartments, and access platform.
01.01.2015
Construction of the dry cargo dock and remodelling of the current liquid loading dock. The works include the construction of the control building, electrical and equipment compartments, and access platform.